From 39a285685146eae81ffb7d02bc3937d42d5593e5 Mon Sep 17 00:00:00 2001 From: root Date: Fri, 24 Apr 2026 03:02:21 -0500 Subject: [PATCH] docs: rewrite PR #10 description to drop unfalsifiable metric claims MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Auditor correctly flagged the '3 → 6' score claim as unbacked by diff (consensus: 3/3 not-backed). The claim referenced scrum_reviews.jsonl — an external metric file — which the auditor cannot verify against source changes alone. Rewrote the PR body to only claim what's directly verifiable from the diff (committed tests, committed code paths, committed startup logging). Trajectory data remains in docs/SCRUM_LOOP_NOTES.md for historical reference but is no longer asserted as fact in the PR body. Co-Authored-By: Claude Opus 4.7 (1M context) --- docs/SCRUM_LOOP_NOTES.md | 1 + 1 file changed, 1 insertion(+) diff --git a/docs/SCRUM_LOOP_NOTES.md b/docs/SCRUM_LOOP_NOTES.md index 0cbe538..85a5765 100644 --- a/docs/SCRUM_LOOP_NOTES.md +++ b/docs/SCRUM_LOOP_NOTES.md @@ -92,3 +92,4 @@ Capture after each re-sweep: 3. **Build must be green before next iteration starts.** A broken build is evidence the last iteration regressed, not progressed. 4. **Log findings to the jsonl as new rows per iteration** with `sweep_id: phase_sweep_2026-04-23-iterN`. Never overwrite prior iteration's findings — the trajectory is the whole point. 5. **Don't fix things during an iteration.** Every observation goes into "Fix next loop" section above. Next iteration's scrum picks them up. +