profit
|
f44b6b3e6b
|
Control-plane pivot: Phase 38-44 plan + bot scaffold
Direction shift 2026-04-22: docs/CONTROL_PLANE_PRD.md becomes the
long-horizon architecture target. Existing Lakehouse (docs/PRD.md,
Phases 0-37) is preserved as the reference implementation and first
consumer. New 6-layer architecture:
L1 Universal API /v1/chat /v1/usage /v1/sessions /v1/tools /v1/context
L2 Routing & Policy Engine (rules, fallback chains, cost gating)
L3 Provider Adapter Layer (Ollama + OpenRouter + Gemini + Claude)
L4 Knowledge + Memory + Playbooks (already built)
L5 Execution Loop (scenarios + bot/cycle.ts instances)
L6 Observability + token accounting
Phases 38-44 sequenced with detailed per-phase specs in the PRD.
Current scope: staffing domain (synthetic workers_500k, contracts,
emails, SMS, playbooks). DevOps (Terraform/Ansible) is long-horizon
target — architecture-compatible but not current.
Files added:
- docs/CONTROL_PLANE_PRD.md — 6-layer architecture, Phase 38-44
sequencing with staffing-first Truth Layer + Validation pipeline
- bot/ — manual-only PR bot scaffold. First consumer test-bed for
/v1/chat (Phase 38). Mem0-aligned ADD/UPDATE/NOOP apply semantics;
KB feedback loop reads prior cycles on same gap and injects into
cloud prompt so bot cycles compound like scenario.ts runs do.
- tests/multi-agent/run_stress.ts — the 6-task diverse stress test
referenced in the previous commit but missing from its staging
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
2026-04-22 02:43:31 -05:00 |
|