# Cross-day lesson — Riverfront Steel, 2026-04-28 _Generated by `gpt-oss:20b` in 6.8s. Based on 3 events + 1 mid-day checkpoints._ ** Before scheduling a Packer in Toledo, confirm the tool calibration and verify the location accuracy to mitigate drift risk. Update the pool status immediately after baseline and recurring fills so the Packer has accurate data. Schedule the Packer only after the pool is refreshed to avoid misplacement failures. Double‑check the Packer’s tool settings in the system before the shift starts.