# Cross-day lesson — Heritage Foods, 2026-05-02 _Generated by `gpt-oss:20b` in 5.1s. Based on 3 events + 1 mid-day checkpoints._ ** Before any shift in Flint, run tool‑calibration and drift diagnostics for all crews, prioritizing the Assembler team. Schedule a pre‑shift check to confirm that each role’s pool assignment is correct and that no gaps remain. Verify that all baseline, expansion, and emergency tasks have the required resources pre‑loaded; a single unfilled gap caused the failures today. Implement this pre‑shift routine for every Flint deployment to avoid repeat failures.