# Cross-day lesson — Midway Distribution, 2026-05-10 _Generated by `gpt-oss:20b` in 7.5s. Based on 3 events + 1 mid-day checkpoints._ ** Before assigning a Packer to Chicago, verify the candidate’s current assignment and cross‑check drift logs for recent misplacements. Pre‑calibrate packing tools and load a backup Packer into the pool to avoid a single point of failure. If a drift risk is flagged, immediately relocate the Packer or switch to a verified alternate. Keep the pool count updated and ensure it matches the required number of roles before each event.