Four findings deferred from the 2026-05-02 scrum, all 1-5 line fixes:
W1 (kimi WARN @ scrum_master_pipeline.ts:1143) — `gemini-3-flash-preview`
hardcoded twice in MAP and REDUCE phases. Extracted TREE_SPLIT_MODEL +
TREE_SPLIT_PROVIDER constants near the existing config block. Diverging
the two would break tree-split coherence (per-shard digests must come
from the same model the reducer collapses).
W2 (qwen WARN @ providers.toml:30) — stale `kimi-k2:1t` reference in
operator-facing comments after PR #13 noted it's upstream-broken. Reframed
as historical context ("was X here pre-2026-05-03 — that model is broken")
so future operators don't paste-route from the comment.
W3 (opus WARN @ vectord-lance/src/lib.rs:622) — temp_path() entropy was
only pid+nanos, which collide under tokio scheduling when multiple tests
in the same cargo process create temp dirs back-to-back. Added per-process
AtomicU64 sequence counter — guarantees uniqueness regardless of clock.
W4 (opus INFO @ scripts/lance_smoke.sh:38) — `|| echo '{}'` swallowed
curl transport failures (gateway down, network broken, timeout), surfacing
as misleading "no method field" jq errors at the next probe. Now captures
$? separately, gates a "curl reachable" probe, and only falls back to
empty body for the dependent jq parse. Smoke went 9 → 10 probes.
Verified: vectord-lance 7/7 tests PASS, gateway cargo check clean,
lance_smoke.sh 10/10 PASS against live gateway.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>