Documents the 13-commit wave end-to-end: - SUBJECT_MANIFESTS_ON_CATALOGD spec Steps 1-8 SHIPPED - 5/7 Phase 1.6 BIPA gates engineering-complete or eng-staged - 6th cross-runtime parity probe (subject_audit, 6/6 byte-identical) Status table for Phase 1.6 with evidence pointers per item. Operational state captures the LH_SUBJECT_AUDIT_KEY + LH_LEGAL_AUDIT_TOKEN_FILE systemd configuration so next session knows what's in place. Cataloged the three runtime-divergence classes the parity probe loop caught + structurally killed (omitempty stripping, time.RFC3339Nano truncation, json.Marshal HTML-escape). Future Go↔Rust work can reference these patterns instead of rediscovering them. Calendar bottleneck is now counsel review of items 1/2/5/6 — engineering has staged everything it can without legal sign-off. Engineering long pole is Gate 3b (deepface), deferred for design conversation. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
…
…
…
…
…
…
Description
Rust-first object storage system
Languages
TypeScript
38.4%
Rust
35.8%
HTML
13.9%
Python
7.8%
Shell
2.1%
Other
2%