profit ed57eda1d8 Merge PR #11: distillation v1.0.0 + Phase 42-45 + auditor cross-lineage + staffing cutover
Closes the long-running scrum/auto-apply-19814 branch.

118 commits including:
- Distillation v1.0.0 substrate (tag distillation-v1.0.0 / e7636f2) — 145 tests, 22/22 acceptance, 16/16 audit-full
- Auditor rebuild on substrate (88s vs 25min, 50x fewer cloud calls)
- Phase 42-45 closure (validator crate + /v1/validate + /v1/iterate + /v1/health + /doc_drift/scan + Phase 44 /v1/chat migration)
- Auditor cross-lineage fabric (Kimi K2.6 / Haiku 4.5 / Opus 4.7 auto-promotion + per-PR cap with auto-reset on push)
- 5-provider routing (added opencode + kimi-direct adapters)
- Mode runner with composed-corpus downgrade gate (codereview_isolation default; composed lost 5/5 on grok-4.1-fast)
- Staffing cutover decisions A/C/D + B safe views — workers_500k_v9 corpus rebuild deferred to background job

Verified before merge:
- audit-full 16/16 required pass
- cargo check -p validator -p gateway clean
- All kimi_architect BLOCK findings dismissed as confabulation, logged in data/_kb/human_overrides.jsonl
- Kimi forensic HOLD on v1.0.0 verified manually: 2/8 false + 6/8 latent guarantees that do not fire under prod data
2026-04-27 15:55:22 +00:00
2026-03-27 05:54:09 -05:00
2026-04-22 02:41:15 -05:00
Description
Rust-first object storage system
6.3 GiB
Languages
TypeScript 38.4%
Rust 35.8%
HTML 13.9%
Python 7.8%
Shell 2.1%
Other 2%