Phase 8 Production Hardening with complete governance infrastructure: - Vault integration with tiered policies (T0-T4) - DragonflyDB state management - SQLite audit ledger - Pipeline DSL and templates - Promotion/revocation engine - Checkpoint system for session persistence - Health manager and circuit breaker for fault tolerance - GitHub/Slack integrations - Architectural test pipeline with bug watcher, suggestion engine, council review - Multi-agent chaos testing framework Test Results: - Governance tests: 68/68 passing - E2E workflow: 16/16 passing - Phase 2 Vault: 14/14 passing - Integration tests: 27/27 passing Coverage: 57.6% average across 12 phases Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6.1 KiB
Phase Dependency Analysis
Overview
This document analyzes the dependencies between Phase 8 (Production Hardening) test results and earlier phase components, identifying gaps and required backfills.
Analysis Date: 2026-01-24 Checkpoint: ckpt-20260124-023706-11d689d4
Phase 8 Test Results Summary
| Test Suite | Tests | Result | Dependencies |
|---|---|---|---|
| GitHub Integration | 10/10 | PASS | Phase 3 (Pipeline scaffolding) |
| Slack Integration | 17/17 | PASS | Phase 3 (Pipeline scaffolding) |
| Error Recovery | 10/10 | PASS | Phase 4 (Revocation Engine) |
| E2E Workflow | 16/16 | PASS | Phases 1-5 (Full stack) |
Dependency Map
1. Integration Tests → Phase 3 (Pipeline)
Files Tested:
/opt/agent-governance/integrations/github/github.py/opt/agent-governance/integrations/slack/slack.py/opt/agent-governance/integrations/common/base.py
Dependencies:
BaseIntegrationclass with rate limiting, retry logic, audit loggingIntegrationEventdataclass with event_type routingIntegrationManagerfor multi-integration coordination
Event Types Used (not in pipeline/core.py):
plan_created → Maps to AgentPhase.PLAN completion
execution_started → Maps to AgentPhase.EXECUTE start
execution_complete → Maps to AgentPhase.EXECUTE completion
violation_detected → Maps to RevocationType events
promotion_requested → Maps to tier promotion workflow
promotion_approved → Maps to tier promotion completion
agent_revoked → Maps to RevocationType.* terminal events
approval_required → Maps to StageType.GATE
heartbeat → Maps to agent health monitoring
Gap Identified: Integration event types should be formally defined in pipeline/core.py as IntegrationEventType enum.
2. Error Recovery Tests → Phase 4 (Revocation)
Files Tested:
/opt/agent-governance/runtime/revocation.py
Dependencies:
ViolationTypeenum (14 types) - More comprehensive than core.pySeverityenum (4 levels) - Not in core.pyRevocationEngineclass- DragonflyDB keys:
agent:{id}:revoke_signal,revocations:ledger,alerts:queue
Type Comparison:
| Location | Enum | Count | Coverage |
|---|---|---|---|
pipeline/core.py |
RevocationType |
6 | Basic revocation triggers |
runtime/revocation.py |
ViolationType |
14 | Full violation taxonomy |
runtime/revocation.py |
Severity |
4 | Severity classification |
Gap Identified: pipeline/core.py should import or re-export the full ViolationType and Severity from runtime/revocation.py to maintain single source of truth.
3. E2E Tests → Phases 1-5 (Full Stack)
Files Tested:
/opt/agent-governance/tests/real_e2e_test.py
Phase 1 (Foundation) Dependencies:
- SQLite Ledger schema:
agent_actions,agent_metrics,violations,promotions - File structure:
/opt/agent-governance/ledger/governance.db
Phase 2 (Vault) Dependencies:
- Vault health check:
GET /v1/sys/health - AppRole authentication:
auth/approle/role/tier1-agent/role-id - Policy files:
t0-observer.hclthrought4-architect.hcl - Secret paths:
secret/data/agents/{agent_id},secret/data/inventory/*
Phase 3 (Pipeline) Dependencies:
- DragonflyDB key patterns from
RedisKeysclass - Instruction packet structure
- Agent state management
Phase 5 (Agent Bootstrap) Dependencies:
- Execution lock acquisition/release
- Heartbeat management
- Error budget tracking
Gap Identified: E2E test uses hardcoded Redis password (governance2026) instead of fetching from Vault.
STATUS.md File Inconsistencies
Several STATUS.md files show "Current Phase: NOT STARTED" in the header but "COMPLETE" or "IN_PROGRESS" in the Activity Log:
| Directory | Header Says | Activity Log Says |
|---|---|---|
runtime/ |
NOT STARTED | COMPLETE |
preflight/ |
NOT STARTED | COMPLETE |
pipeline/ |
NOT STARTED | COMPLETE |
integrations/ |
NOT STARTED | IN_PROGRESS |
integrations/github/ |
NOT STARTED | (needs update) |
integrations/slack/ |
NOT STARTED | (needs update) |
Action Required: Update STATUS.md files to reflect actual completion state.
Backfill Requirements
Priority 1: Type Synchronization ✅ COMPLETE
-
Updated
pipeline/core.pyto include:- ✅
ViolationSeverityenum (4 levels) - ✅ Full
ViolationTypeenum (14 types with severity mapping) - ✅
IntegrationEventTypeenum (9 event types) - ✅
VIOLATION_SEVERITY_MAPfor severity lookups - ✅
INTEGRATION_EVENT_PHASE_MAPfor lifecycle mapping - ✅
RevocationTypealias for backwards compatibility
- ✅
-
Import flow established:
pipeline/core.py (authoritative source) ↓ runtime/revocation.py (can now import from core) ↓ integrations/*.py (uses IntegrationEventType)
Priority 2: STATUS.md Corrections ✅ COMPLETE
Updated files to show correct Current Phase:
- ✅
/opt/agent-governance/runtime/STATUS.md→ COMPLETE - ✅
/opt/agent-governance/preflight/STATUS.md→ COMPLETE - ✅
/opt/agent-governance/pipeline/STATUS.md→ COMPLETE - ✅
/opt/agent-governance/integrations/STATUS.md→ IN_PROGRESS (with test results) - ✅
/opt/agent-governance/integrations/github/STATUS.md→ COMPLETE (10/10 tests) - ✅
/opt/agent-governance/integrations/slack/STATUS.md→ COMPLETE (17/17 tests)
Priority 3: Credential Hardening (Deferred)
Replace hardcoded credentials in test files with Vault lookups:
/opt/agent-governance/tests/real_e2e_test.py:28-REDIS_PASSWORD- Status: Low priority - test files only, not production code
Summary
| Category | Items | Status |
|---|---|---|
| Type definitions in sync | 3 gaps | ✅ COMPLETE |
| STATUS.md files accurate | 6 files | ✅ COMPLETE |
| Credentials secure | 1 hardcoded | Deferred (test-only) |
| Tests passing | 53/53 | ✅ COMPLETE |
Result: All critical backfill requirements addressed. Phase 8 Production Hardening can proceed with confidence that earlier phases are consistent.