Implements PROMPT.md / docs/REVIEW_PIPELINE.md Phase 2:
- internal/llm/ollama.go — real Ollama provider:
- HealthCheck probes /api/tags + a 1-token completion + a JSON-mode
probe ({"ok": true} round-trip), populating the model-doctor.json
schema documented in docs/LOCAL_MODEL_SETUP.md
- Complete + CompleteJSON via /api/chat with stream=false
- think=false set for ALL completions (qwen3.5:latest is reasoning-
capable but the inner-loop hot path wants direct answers, not
reasoning traces consuming the token budget — same finding as
the Lakehouse-Go chatd 2026-04-30 wave)
- internal/llm/review.go — Reviewer wrapper:
- 2-attempt flow: prompt → parse → repair-prompt → parse
- Strict JSON shape enforced; markdown fences stripped before parse
- Severity normalized to enum; out-of-range confidence clamped
- Per-file chunking (file-level for v0; function-level Phase D+)
- Bounded by review-profile max_file_bytes + max_llm_chunk_chars
- pipeline.go — Phase 2 wired between static scan + report gen:
- --enable-llm flag opts in (off by default — static-only is
cheaper and faster)
- Raw output ALWAYS saved to llm-findings.raw.json (forensics)
- Normalized findings → llm-findings.normalized.json
- LLM findings merged into the report findings list (sourced
"llm" so consumers can filter)
- Receipts honestly mark phase status: "ok" | "degraded" | "skipped"
- cli model doctor — real probes replace the Phase A stub.
Verified:
- model doctor: status="ok" with qwen3.5:latest + qwen3:latest both
loaded, basic_prompt_ok=true, json_mode_ok=true
- insecure-repo with --enable-llm: 9 LLM findings; qwen3.5 correctly
flagged SQLi, RCE, hardcoded credentials as critical with verbatim
evidence; 27s wall for 3 chunks
- clean-repo with --enable-llm: 0 LLM findings, 4 parsed chunks, 2.8s
- self-review with --enable-llm: 77 LLM findings + 83 static; 3 of
~30 chunks needed retry (PROMPT.md, REPORT_SCHEMA.md,
SCRUM_TEST_TEMPLATE.md — all eventually parsed); 5min wall
go vet + go test -short clean. Fixture stray.go now `package fixture`
so go-tooling doesn't choke on the orphan.
Phase D (validator cross-check) + Phase E (memory + diff/rules
subcommands) remain.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
1.6 KiB
1.6 KiB
Risk Register
Findings ranked by severity. Suspected rows haven't been validated yet (Phase D).
| ID | Severity | Status | File | Line | Title |
|---|---|---|---|---|---|
9bc97c579efc |
critical | suspected | src/handler.go |
23 | Possible secret committed to source |
9bc97c579efc |
critical | suspected | src/handler.go |
23 | Possible secret committed to source |
d3c2c5606e1d |
critical | suspected | src/server.js |
5 | Possible secret committed to source |
750676119e4a |
high | confirmed | .env |
— | Environment file in source tree |
3a198539c923 |
high | suspected | src/handler.go |
14 | Raw SQL interpolation |
5bf85ae888a0 |
high | suspected | src/handler.go |
19 | Shell command execution |
ef8bb39704d3 |
high | suspected | src/server.js |
2 | Wildcard CORS |
4d59806aeb57 |
medium | confirmed | . |
— | No tests found |
eb3c41b3a186 |
medium | suspected | src/handler.go |
10 | Hardcoded absolute path |
bb70e8e262d6 |
medium | suspected | src/handler.go |
11 | Hardcoded private-network IP |
512b795dc551 |
medium | suspected | src/huge.go |
1-901 | Large file |
7ed1cab08825 |
medium | suspected | src/server.js |
7 | Mutation route in file with no visible auth |
2b765c240c96 |
medium | suspected | src/server.js |
8 | Mutation route in file with no visible auth |
f99cd5bb5f2c |
low | suspected | src/handler.go |
22 | TODO/FIXME comment |
f3e510b70ec9 |
low | suspected | src/handler.go |
9 | TODO/FIXME comment |
4a631055edd1 |
low | suspected | src/server.js |
1 | TODO/FIXME comment |